Nayabazaar To Melli (26.96 KM)- Open
Melli To Rangpo (17 KM)- Open
Rangpo To Singtam (10 KM)- Open
Singtam To Ranipool (20 KM)- Open
Ranipool To Gangtok (11 KM)- Open
Gangtok To Tsomgo (34.5 KM)- Blocked at Km. 24.6& 24.9, expected time to open by 9th September 2010. Not Needed